Time for roller skating?
Posted by Rich on 29 Oct 2009 at 07:44 pm | Tagged as: General, Construction
After a cold fall, it has warmed back up a bit out here. We have been getting a few hours of work done nearly everyday at the crib. The highlights include:
- The front bin has been removed.
- Fresh sub-floor covering the greenhouse sides, the front bin, and the opposite side up to where the stairs are planned.
- Bunch of structural repairs and reinforcements
- Two lost windows covered with plywood for the winter
- Still trying to evict the pigeons.
- A new pit cover in the greenhouse.
I want/hope to make a big swoop of progress to finish up a bit this weekend, and get some pictures taken again. The next big steps will be:
- Framing for windows on the front wall. Probably install them in the Spring anyway
- A Staircase!
- Electrical on the 2nd floor. An outlet or two will be better then these extension cords.
- Cover that last window.
- Add solid sheathing between greenhouse and ‘house’
The size and shape of the main room has really become apparent. It looks pretty cool. All this floor to walk around on - amazing. What else could you do up here?